Resources · From the coaching tool

Stakeholder Conversations: Before, During, and After the Design

The diagnostic call gets most of the attention. The conversations before and after it decide whether the program actually lands.

Most of the craft advice around client conversations focuses on one moment: the diagnostic call. That's fair — it's the highest-leverage single conversation you'll have, and getting it wrong is expensive. But treating it as the only conversation that matters is its own kind of mistake. A design can be diagnosed perfectly and still fail because of what happened three weeks before that call, or three weeks after the program launched.

Pre-design: the conversation before you're in the room

By the time you're on a formal diagnostic call, a version of the need has usually already been decided by people you haven't spoken to. Someone wrote a brief, someone approved a budget line, someone told the L&D team what "good" looks like. Your first real job isn't asking discovery questions — it's reconstructing that earlier conversation so you know what's already fixed and what's still open.

Two things are worth doing before the call, not during it. First, ask directly who else was involved in deciding this was worth doing, and whether you can get even fifteen minutes with one of them — a sponsor, a business leader, a recent participant from a similar past program. Second, ask what would make this a failure in the sponsor's eyes, not just what would make it a success. Failure conditions are often more specific and more honestly stated than success conditions, and they tell you what's actually being protected against.

During design: the conversation that keeps a program honest

The riskiest period isn't the diagnostic call, it's the silence after it — the weeks where you're building and the client isn't watching closely. Left alone that long, two things drift: the client's mental model of what they asked for quietly diverges from what you're building, and your own read of the need can harden into an assumption you stop checking.

The fix isn't more meetings, it's the right kind of meeting: a short structured check-in built around one open question — "here's the shape of what we're building, does this still match what you're picturing?" — rather than a general status update. Status updates confirm dates. This question surfaces drift while it's still cheap to correct. It's also the moment to protect scope. Every additional stakeholder who gets pulled into review adds a version of "good" that has to be reconciled, and the person best positioned to hold that line is whoever owns the relationship, not whoever is doing the content work.

Post-design: the conversation everyone skips

Most engagements end with a delivery date, not a conversation. That's a missed opportunity twice over. Once, because the single best source of "here's what to design differently next time" is a structured debrief with the sponsor thirty to sixty days after rollout — while it's still fresh, before the org's attention has moved elsewhere. And again, because that same conversation is where the business case gets made or lost: whether the metric named back in the business-impact discussion actually moved, and whether the sponsor is willing to say so on the record.

The habit worth building is scheduling that follow-up conversation at the start, not chasing it at the end. Put it on the calendar in the same conversation where you agree on success metrics, so it isn't a favor you're asking for later — it's just the next step everyone already agreed to.

The throughline

Each of these three conversations protects against a different failure. Pre-design protects against designing to the wrong brief. During-design protects against slow, invisible drift. Post-design protects against never finding out whether any of it worked. Skipping any one of them doesn't just lose that conversation's value — it usually means the next engagement with the same client starts from a worse diagnostic position than this one did.